Thursday, January 6, 2011

finished tiles

So the bathroom and the laundry area are finished, with all of the paper off the tiles, and even the excess grout rinsed from around the edges, though we'll probably still need to sand a little bit to get it nice and even.

even closer...
The next step for the bathroom is to test the water pressure so we know what type of shower to get. And all of the granite in the house will be installed tomorrow (we hope), and the bathroom sink will be installed at the same time. At this point the toilet can also be installed and grouted around the edges, but there's only so many things that can happen simultaneously.

lavandaria
As for the laundry area, the space underneath the sink will be painted, and there will be a cabinet underneath as well, though this cabinet is lower down the priority list (kitchen and bathroom first). The washing machine will go to the right of the sink.


And a few more photos from yesterday: Pirata napping, freshly varnished windows and doors drying inside to avoid the rain, the stoop after the rain, and Eduardo cleaning up the bathroom.


No comments:

Post a Comment